IMPACT ENVIRONMENTAL LIMITED - Accra, Ghana
Sustainable environmental solutions for Ghana's future.
0.0
0 Reviews
- Verified
Listing - +7Years
With Us
Company name
IMPACT ENVIRONMENTAL LIMITED
Location
Ofankor Barrier box 35, Accra, Ghana
Contact number
Mobile phone
Working hours
- Monday: 8am - 5pm
- Tuesday: 8am - 5pm
- Wednesday: 8am - 5pm
- Thursday: 8am - 5pm
- Friday: 8am - 5pm
- Saturday: 8am - 5pm
- Sunday: Closed
Company manager Emmanuel Chibueze
Establishment year 2010
Employees 26-50
Registration code CA-75,931
E-mail address
Company description
IEL has been providing environmental and waste management solutions to varied clientele over the last 10 years. We have provided numerous liquid waste management facilities and systems across Ghana. Attached is a pictorial reference of some of our recent projects!
The design concept is the application of anaerobic digester systems to treat liquid and solid biodegradable waste on-site. The design capacity is based on a waste per capita of 10 litres for about 150 people. An average Hydraulic Retention Time (HRT) of 30 days has been adopted to achieve satisfactory decomposition of the liquid organic matter within the existing tropical ambient temperature conditions.
The land required for the various infrastructural elements shall be available at the empty spaces within the project
1.0 Scope of Works
Biogas (Anaerobic) Digester Farm
This shall be the provision and supply of all necessary materials, labour, equipment, tools and the supervision for the construction of a centralized bio-digester farms (see attached drawings) to manage on-site waste. The digesters will be constructed using burnt bricks to form a fixed-dome sub-structure.
At all times, IEL shall provide the technical supervision and labour services during the project execution and will ensure that the project does not slip behind schedule.
IEL fully guarantees the whole system and provides 100% post construction maintenance for the life of the facility to ensure that the sewage objectives are constantly realized.
Civil & Ancillary Works
This involves the construction of effluent management units. The works shall include excavations, plumbing and all associated civil works for an effective site drainage system (e.g. inspection chambers, inlet and outlet chambers and drains, etc)
The major infrastructural development to deliver on the sewage objectives are, but not limited to;
• Establishment of a centralized biogas digester farm to handle all liquid waste (sewage) from the entire area.
(It is assumed that the whole area is already equipped with the sewerage network (by the client) that would enable the transfer of liquid waste from the various blocks to the location of the centralized biogas digester farm. If not IEL can make a separate proposal to undertake such works)
• Management of all effluent from the treatment of biodegradable waste for landscaping and horticultural works within the project area
• Installation of infrastructure for the utilization of the biogas from the centralized digester farm (Cost not included in this scope)
The design concept is the application of anaerobic digester systems to treat liquid and solid biodegradable waste on-site. The design capacity is based on a waste per capita of 10 litres for about 150 people. An average Hydraulic Retention Time (HRT) of 30 days has been adopted to achieve satisfactory decomposition of the liquid organic matter within the existing tropical ambient temperature conditions.
The land required for the various infrastructural elements shall be available at the empty spaces within the project
Show more
area. Transfer sumps may be constructed where topographical challenges are encountered. All the treatment units are sub-structural.1.0 Scope of Works
Biogas (Anaerobic) Digester Farm
This shall be the provision and supply of all necessary materials, labour, equipment, tools and the supervision for the construction of a centralized bio-digester farms (see attached drawings) to manage on-site waste. The digesters will be constructed using burnt bricks to form a fixed-dome sub-structure.
At all times, IEL shall provide the technical supervision and labour services during the project execution and will ensure that the project does not slip behind schedule.
IEL fully guarantees the whole system and provides 100% post construction maintenance for the life of the facility to ensure that the sewage objectives are constantly realized.
Civil & Ancillary Works
This involves the construction of effluent management units. The works shall include excavations, plumbing and all associated civil works for an effective site drainage system (e.g. inspection chambers, inlet and outlet chambers and drains, etc)
The major infrastructural development to deliver on the sewage objectives are, but not limited to;
• Establishment of a centralized biogas digester farm to handle all liquid waste (sewage) from the entire area.
(It is assumed that the whole area is already equipped with the sewerage network (by the client) that would enable the transfer of liquid waste from the various blocks to the location of the centralized biogas digester farm. If not IEL can make a separate proposal to undertake such works)
• Management of all effluent from the treatment of biodegradable waste for landscaping and horticultural works within the project area
• Installation of infrastructure for the utilization of the biogas from the centralized digester farm (Cost not included in this scope)
Listed in categories
Products & Services (1)
- BIOGAS CONSTRUCTION5.0 Construction Guarantee All works provided are guaranteed against constructional defects. IEL ...
Reviews
This company has no reviews. Be the first to share your experiences!
Questions & Answers
Have questions? Get answers from IMPACT ENVIRONMENTAL LIMITED or GhanaYello users. Visitors haven’t asked any questions yet.
Verified Business
The accuracy of the company profile for IMPACT ENVIRONMENTAL LIMITED is validated by the company owner, representative, or directory administrator.
Last update on
Registered with us on
Last update on
Registered with us on