- Ghana
- Accra
- Water Treatment
- Ghana Water Co. Ltd. (Head Office)
Ghana Water Co. Ltd. (Head Office) - Accra
Reliable water supply for Ghana's communities.
0.0
0 Reviews
- Verified
Listing
Recentrly
Updated
Updated
Company name
Ghana Water Co. Ltd. (Head Office)
Location
28th February Road (near Independence Square) Post Office Box M. 194, Accra, Ghana
Contact number
Fax
+233 302 663552
Website address
Working hours
- Monday: 09:00 - 17:00
- Tuesday: 09:00 - 17:00
- Wednesday: 09:00 - 17:00
- Thursday: 09:00 - 17:00
- Friday: 09:00 - 17:00
- Saturday: Closed
- Sunday: Closed
E-mail address
Company description
Ghana Water Company Limited was established on 1st July 1999, following the conversion of Ghana Water and Sewerage Corporation into a state-owned limited liability company under the Statutory Corporations (Conversion to Companies) Act 461 of 1993 as amended by LI 1648.
The first public water supply system in Ghana, then Gold Coast, was established in Accra just before World War I. Other systems were built exclusively for other urban areas among them the colonial capital of Cape Coast, Winneba and Kumasi in the1920s.
During this period, the water supply systems were managed by the Hydraulic Division of Public Works Department. With time the responsibilities of the Hydraulic Division were widened to include the planning and development of water supply systems in other parts of the
Ilevels mainly as a result of deteriorating pipe connections and pumping systems. A World Bank report in 1998 states that: “The water supply systems in Ghana deteriorated rapidly during the economic crises of the 1970´s and early 1980´s when Government’s ability to adequately operate and maintain essential services was severely constrained.”
GWSC largely experienced operational difficulties because of inadequate funding. From its inception, GWSC depended solely on government subvention to meet both operational and development costs. However, the annual government subvention was not adequate to meet the operational and development needs of the Corporation over the period. In addition, the annual subvention was either often not released on time or in most cases not released at all before the end of the budgetary year.
GWSC therefore met its operating costs at a level constrained by unavailability or inadequacy of funds. The lack of funds to meet operational costs resulted in the poor state of existing infrastructure especially the distribution systems.
Before 1957, there were 35 pipe-borne water supply systems in the country. In a bid to promote rapid national development after Ghana’s Independence, the government launched a crash programme for urban water expansion and accelerated rural development. As a result, by 1979 there were 194 pipe-borne and 2,500 hand pumped borehole systems in the country. By 1984, additional 3000 boreholes had been drilled and fitted with hand pumps. However by the late 1980’s and early 1990, 33% of the water supply systems had deteriorated greatly or completely broken down due to inadequate funding to carry out maintenance and rehabilitation.
INTERVENTIONS TO IMPROVE EFFICIENCY:
To reverse the decline in water supply services, various sector reforms and improvement projects were undertaken in 1970, 1981 and 1988 by the World Bank, IDA, donor countries and other external support agencies such as Austrian Government, Italian Government, Nordic Development Fund, the African Development Bank, CIDA, DFID, KfW, GTZ, OECF, ECGD and CFD/ADF.
Though some gains were derived from these interventions, their general impact on service delivery was very disappointing. Due to the failure of these interventions to achieve the needed results, several efforts were made to improve efficiency within the water supply sector in Ghana especially during the era of the Economic Recovery Programme from 1983 to 1993.
During this period, loans and grants were sought from the World Bank and other donors for rehabilitation and expansion programmes, training of personnel and procurement of transport and maintenance equipment.
In 1986, subvention for operations and maintenance was withdrawn although funding for development programmes continued. User fees for water supply were increased and subsidies on water tariffs were gradually removed for GWSC to achieve self-financing. The government at that time approved a formula for annual tariff adjustments to enable the Corporation generate sufficient funds to cover all annual recurrent costs as well as attain some capacity to undertake development projects.
For political reasons, this tariff formula was not applied and, over the years, irregular tariff increases were always below cost recovery levels resulting in heavy corporate deficit financing and ineffective service delivery.
WATER SECTOR REFORMS IN GHANA:
In 1987, a “Five-Year Rehabilitation and Development Plan” for the sector was prepared which resulted in the launching of the Water Sector Restructuring Project (WSRP). Multilateral and bilateral donors contributed $140 million to support the implementation of the WSRP.
The WSRP was aimed at reducing unaccounted for water, rationalisation of the workforce, hiring of professionals and training of staff. A strong focus of the WSRP was also on improved management and increased efficiency through organisational change of the water sector. Accordingly, a number of reforms within the Ghanaian water sector were initiated in the early 1990s.
As a first step, responsibilities for sanitation and small town water supply were decentralized and moved from Ghana Water and Sewerage Corporation to the District Assemblies in 1993.
The Environmental Protection Agency (EPA) was established in 1994 to ensure that water operations would not cause any harm to the environment.
The Water Resources Commission (WRC) was founded in 1996 to be in charge of overall regulation and management of water resources utilization.
In 1997, the Public Utilities Regulatory Commission (PURC) came into being with the purpose of setting tariffs and quality standards for the operation of public utilities.
Community Water and Sanitation Agency (CWSA) was established in 1998 to be responsible for management of rural water supply systems, hygiene education and provision of sanitary facilities. After the establishment of CWSA, 120 water supply systems serving small towns and rural communities were transferred to the District Assemblies and Communities to manage under the community-ownership and management scheme.
Finally, pursuant to the Statutory Corporations (Conversion to Companies) Act 461 of 1993 as amended by LI 1648, on 1st July 1999, GWSC was converted into a 100% state owned limited liability, Ghana Water Company Limited, with the responsibility for urban water supply only.
The first public water supply system in Ghana, then Gold Coast, was established in Accra just before World War I. Other systems were built exclusively for other urban areas among them the colonial capital of Cape Coast, Winneba and Kumasi in the1920s.
During this period, the water supply systems were managed by the Hydraulic Division of Public Works Department. With time the responsibilities of the Hydraulic Division were widened to include the planning and development of water supply systems in other parts of the
Show more
country.Ilevels mainly as a result of deteriorating pipe connections and pumping systems. A World Bank report in 1998 states that: “The water supply systems in Ghana deteriorated rapidly during the economic crises of the 1970´s and early 1980´s when Government’s ability to adequately operate and maintain essential services was severely constrained.”
GWSC largely experienced operational difficulties because of inadequate funding. From its inception, GWSC depended solely on government subvention to meet both operational and development costs. However, the annual government subvention was not adequate to meet the operational and development needs of the Corporation over the period. In addition, the annual subvention was either often not released on time or in most cases not released at all before the end of the budgetary year.
GWSC therefore met its operating costs at a level constrained by unavailability or inadequacy of funds. The lack of funds to meet operational costs resulted in the poor state of existing infrastructure especially the distribution systems.
Before 1957, there were 35 pipe-borne water supply systems in the country. In a bid to promote rapid national development after Ghana’s Independence, the government launched a crash programme for urban water expansion and accelerated rural development. As a result, by 1979 there were 194 pipe-borne and 2,500 hand pumped borehole systems in the country. By 1984, additional 3000 boreholes had been drilled and fitted with hand pumps. However by the late 1980’s and early 1990, 33% of the water supply systems had deteriorated greatly or completely broken down due to inadequate funding to carry out maintenance and rehabilitation.
INTERVENTIONS TO IMPROVE EFFICIENCY:
To reverse the decline in water supply services, various sector reforms and improvement projects were undertaken in 1970, 1981 and 1988 by the World Bank, IDA, donor countries and other external support agencies such as Austrian Government, Italian Government, Nordic Development Fund, the African Development Bank, CIDA, DFID, KfW, GTZ, OECF, ECGD and CFD/ADF.
Though some gains were derived from these interventions, their general impact on service delivery was very disappointing. Due to the failure of these interventions to achieve the needed results, several efforts were made to improve efficiency within the water supply sector in Ghana especially during the era of the Economic Recovery Programme from 1983 to 1993.
During this period, loans and grants were sought from the World Bank and other donors for rehabilitation and expansion programmes, training of personnel and procurement of transport and maintenance equipment.
In 1986, subvention for operations and maintenance was withdrawn although funding for development programmes continued. User fees for water supply were increased and subsidies on water tariffs were gradually removed for GWSC to achieve self-financing. The government at that time approved a formula for annual tariff adjustments to enable the Corporation generate sufficient funds to cover all annual recurrent costs as well as attain some capacity to undertake development projects.
For political reasons, this tariff formula was not applied and, over the years, irregular tariff increases were always below cost recovery levels resulting in heavy corporate deficit financing and ineffective service delivery.
WATER SECTOR REFORMS IN GHANA:
In 1987, a “Five-Year Rehabilitation and Development Plan” for the sector was prepared which resulted in the launching of the Water Sector Restructuring Project (WSRP). Multilateral and bilateral donors contributed $140 million to support the implementation of the WSRP.
The WSRP was aimed at reducing unaccounted for water, rationalisation of the workforce, hiring of professionals and training of staff. A strong focus of the WSRP was also on improved management and increased efficiency through organisational change of the water sector. Accordingly, a number of reforms within the Ghanaian water sector were initiated in the early 1990s.
As a first step, responsibilities for sanitation and small town water supply were decentralized and moved from Ghana Water and Sewerage Corporation to the District Assemblies in 1993.
The Environmental Protection Agency (EPA) was established in 1994 to ensure that water operations would not cause any harm to the environment.
The Water Resources Commission (WRC) was founded in 1996 to be in charge of overall regulation and management of water resources utilization.
In 1997, the Public Utilities Regulatory Commission (PURC) came into being with the purpose of setting tariffs and quality standards for the operation of public utilities.
Community Water and Sanitation Agency (CWSA) was established in 1998 to be responsible for management of rural water supply systems, hygiene education and provision of sanitary facilities. After the establishment of CWSA, 120 water supply systems serving small towns and rural communities were transferred to the District Assemblies and Communities to manage under the community-ownership and management scheme.
Finally, pursuant to the Statutory Corporations (Conversion to Companies) Act 461 of 1993 as amended by LI 1648, on 1st July 1999, GWSC was converted into a 100% state owned limited liability, Ghana Water Company Limited, with the responsibility for urban water supply only.
Location map
Expand Map
Listed in categories
Reviews
This company has no reviews. Be the first to share your experiences!
Questions & Answers
Our taps have not been running for the past 4 days at klagon.
It is really inconvenient here.
What is happening?
It is really inconvenient here.
What is happening?
For the past 5day our tap is not flowing Awoshie A-Lang what is happening
How does your current meter system work, that is, what is the mechanism involved in meter reading
How much would it cost for service with a distance of 70-100metres from the service line , and how long does it take? what are the basic requirement before the service can be offered.
Branches
Bawku, Bawku
near VRA, Bolgatanga
Kumasi, Kumasi
Old Cemetery Rd., Sunyani
Brimsu Water Works, Cape Coast
P.O. BOX 406, Koforidua
Old Hospital Rd., Tamale
Kokompe Rd., Tamale
Water Examination Laboratory, Kumbungu, Tamale
Kumasi North, Suame, Kumasi
Suame Tower, Kumasi
Kumasi South, Kaase, Kumasi
Kumasi East, Aboabo, Kumasi
KS 767, Kumasi
Barikese Headworks, Kumasi
Owabi Headworks, Kumasi
Comm. Water Sanitation Division, Kumasi
near Tema Sports Stadium, Tema
Madina near District Council Office, Accra
Palm Wine Junction, Giffard Road, Accra
Verified Business
The accuracy of the company profile for Ghana Water Co. Ltd. (Head Office) is validated by the company owner, representative, or directory administrator.
Last update on
Registered with us on
Last update on
Registered with us on